Objective 1401.1  


Latest version.
  • Monroe County shall provide the capital improvements necessary to correct existing deficiencies, to accommodate projected future growth, and to replace obsolete and worn-out facilities, in accordance with an adopted Capital Improvements Program. [F.S. § 163.3177(3)(a)1.]

    Policy 1401.1.1

    Monroe County shall update annually the existing County Capital Improvements Program to incorporate the improvements identified in the Five-Year Schedule of Capital Improvements Table 4.1. [F.S. § 163.3177(3)(a)5.(b)]

    Policy 1401.1.2

    Monroe County shall annually update the Comprehensive Plan Five-Year Schedule of Capital Improvements. Proposed revisions to the Schedule, including those addressing the replacement and renewal of capital facilities, shall be evaluated and updated in accordance with the following considerations (not listed in order of priority):

    1.

    consistency with the relevant elements of the Comprehensive Plan;

    2.

    the elimination of public hazards;

    3.

    consider sea level rise projections as they relate to transportation and bridging projects in particular;

    4.

    the County's need for financial expenditures for infrastructure improvements within or proximate to vulnerable areas;

    5.

    the elimination of existing deficiencies;

    6.

    financial feasibility including the impact on the annual operating and capital budgets;

    7.

    the location in relation to the Future Land Use Map;

    8.

    accommodation of the demands from redevelopment and new development;

    9.

    the consistency of the improvement relative to the plans of state agencies and the South Florida Water Management District; and

    10.

    the availability of other revenue sources including, but not limited to, FDOT Project funding and FDOT Traffic Operations funds from District Dedicated Revenue (DDR) sources.

    Revisions to the schedule shall be incorporated into the Capital Improvements Program on an annual basis. [F.S. § 163.3177(3)(a)5.(b)]

    Policy 1401.1.3

    Capital improvement projects required to correct existing facility deficiencies shall receive priority over those projects required to serve future development. [F.S. § 163.3177(3)(a)1.]

    Five-Year Schedule of Capital Improvements Table
    Fiscal Year 2017—2021

    TRANSPORTATION (Policies 301.1.1 and 301.1.2)
    Road & Bridge Projects Project Project
    Budget
    Appropriated
    As of 9/30/16
    FY 2017
    FY 2018
    FY 2019
    FY 2020
    FY 2021
    Unfunded
    Total
    Florida Department of Transportation
    Card Sound Road Bridge #904990 Over Intracoastal Water Bridge-Repair/Rehab. 230,597 - - - - - 230,597
    Garrison Bight Bridge 904025 Palm Ave & N. Roosevelt Bridge-Repair/Rehab. 1,627,354 70,274 1,697,628
    Monroe County Southard Street Resurfacing - 1,004,409 - - - - 1,004,409
    Monroe County SCOP Contingency Small Outreach Program Resurfacing 1,000 296,380 297,380
    Monroe County DDR Arterial Reserve Funding Action - - 2,280,194 - - - 2,280,194
    Monroe County Long Range Transportation Plan Planning Model - 300,000 300,000 300,000 300,000 -
    1,200,000
    Monroe County Lower Keys Scenic Highway Viewing Area Wayside Park 903,000 903,000
    Monroe County Public Information - Dist 6 Construction Office Public Info/
    Education
    -
    200,000 200,000 200,000 200,000 -
    800,000
    Monroe County Traffic Signal Maint/Operations Traffic Signals 115,276 128,504 84,390 87,484 90,984 -
    506,638
    Monroe County DDR Resurface Contingency Resurfacing 9,954 -
    -
    -
    -
    -
    9,954
    Monroe Countywide DDR Misc Construction 461,428 -
    -
    500,000 1,289,857 -
    2,251,285
    Monroe Countywide Lighting Maintenance 46,314 47,704 49,135 50,610 46,726 -
    240,489
    Monroe County Resurfacing Target (RURL) Resurfacing -
    -
    -
    6,173,000 -
    -
    6,173,000
    Monroe Countywide Traffic Operations Traffic Ops
    Improve
    1,100,009 -
    1,156,806 -
    -
    -
    2,256,815
    Pigeon Key Ferry Service Water Taxi 250,000 250,000 250,000 -
    -
    -
    750,000
    SR 5 MM 19.79 to MM 20.66 Resurfacing 60,000 1,538,169 264,000
    SR 5 MM 23.12 to MM 25.4 Resurfacing 76,796 3,276,395 -
    -
    -
    3,353,191
    SR 5 MM 90.8 to MM 97 Landscaping 20,536 -
    -
    -
    -
    -
    20,536
    SR 5 MM 97 to MM 99.6 Landscaping 21,563 -
    -
    -
    -
    -
    21,563
    SR 5 MM 99.6 to MM 106.3 Landscaping 26,667 -
    -
    -
    -
    -
    26,667
    SR 5 MM 4.5 to MM 9.8 Resurfacing 10,961 -
    -
    -
    -
    -
    10,961
    SR 5 7 Mile Bridge Over Moser Channel Bridge Repair Bridge-Repair/Rehab. 13,253,312 -
    -
    -
    -
    -
    13,253,312
    SR5 Hrt Trl-Vistas at Various Locations Bike Path / Trail 1,108,375 -
    -
    -
    -
    1,108,375
    SR 5 Hrt Trl Kemp Channel Bridge Bike Path / Trail 66,463 -
    -
    -
    -
    -
    66,463
    SR 5 From S. Roosevelt Blvd to S. of Mac Donald Sidewalk 71,260 -
    -
    -
    -
    -
    71,260
    SR 5 Over Niles Channel Niles Channel Bridge Repair Bridge-Repair/Rehab. 239,296 -
    -
    -
    -
    239,296
    SR 5 Over Boca Chica Channel Bridge #900003 & 900074 Repair Bridge-Repair/Rehab. 105,517 -
    -
    -
    -
    -
    105,517
    SR A1A/S. Roosevelt Bertha St. to End of Smathers Beach Pavement Reconstruct 19,057 -
    -
    -
    -
    -
    19,057
    Subtotal - FDOT 19,824,735 6,815,455 4,880,905 7,311,094 1,927,567 -
    40,759,756
    Revenues - FDOT 19,824,735 6,815,455 4,880,905 7,311,094 1,927,567 -
    40,759,756
    Monroe County
    Road Paving Program 22,000,000 1,500,000 4,000,000 4,500,000 4,000,000 4,000,000 4,000,000 -
    20,500,000
    Revenues
    304 - Infrastructure Sales Surtax 3,500,000 4,000,000 3,500,000 3,500,000 3,500,000 -
    18,000,000
    102 - Fuel Tax 500,000 500,000 500,000 500,000 500,000 2,500,000
    Total Revenues 4,000,000 4,500,000 4,000,000 4,000,000 4,000,000 -
    20,500,000
    Lake Surprise Estates Paving 3,344,172 2,262,383 1,081,789 -
    -
    -
    -
    -
    1,081,789
    Revenues
    304 - Infrastructure Sales Surtax 1,081,789 -
    -
    -
    -
    -
    1,081,789
    Sexton Cove Paving 1,429,511 143,889 1,285,622 -
    -
    -
    -
    -
    1,285,622
    Revenues
    304 - Infrastructure Sales Surtax 1,285,622 -
    -
    -
    -
    -
    1,285,622
    Stock Island I 3,504,770 274,035 3,230,735 -
    -
    -
    -
    -
    3,230,735
    Revenues
    304 - Infrastructure Sales Surtax 3,230,735 -
    -
    -
    -
    -
    3,230,735
    Stock Island II 2,450,000 2,450,000 -
    -
    -
    -
    2,450,000
    Revenues
    304 - Infrastructure Sales Surtax 2,450,000 -
    -
    -
    -
    2,450,000
    1 Street/Bertha 2,535,945 2,535,945 -
    -
    -
    -
    -
    2,535,945
    Revenues
    304 - Infrastructure Sales Surtax 2,535,945 -
    -
    -
    -
    -
    2,535,945
    Truman Bridge-Replacement 2,160,480 270,480 -
    1,640,000 -
    -
    -
    884,520 2,524,520
    Revenues -
    304 - Infrastructure Sales Surtax 960,480 960,480
    130 - Roadways Impact Fees -
    679,250 679,250
    Total Revenues -
    1,639,730 -
    -
    -
    -
    1,639,730
    US 1 Bayside Bike/Shared Use Path 2,251,042 2,327,491 620,199 -
    -
    -
    -
    -
    620,199
    Revenues
    304 - Infrastructure Sales Surtax 620,199 -
    -
    -
    -
    620,199
    Key Largo/Burton Drive Road 2,160,000 -
    1,060,000 1,100,000 -
    -
    -
    2,160,000
    Revenues
    304 - Infrastructure Sales Surtax 1,060,000 1,100,000 -
    -
    -
    2,160,000
    Sustainability-Roads 425,000 425,000 -
    -
    -
    -
    425,000
    Revenues
    130 - Roadways Impact Fees 425,000 425,000
    Garrison Bight Bridge Repair 1,792,438 1,371,641 420,797 -
    -
    -
    420,797
    Revenues
    125 - State Grants 420,797 -
    -
    420,797
    Sugarloaf Blvd Bridge 2,225,224 2,089,948 135,276 -
    -
    -
    -
    135,276
    Revenues
    102 - Fuel Tax 135,276 -
    -
    -
    -
    135,276
    Subtotal - Monroe County 46,278,582 10,239,867 17,245,363 7,240,000 4,000,000 4,000,000 4,000,000 884,520 37,369,883
    Total Road & Bridge Projects 37,070,098 14,055,455 8,880,905 11,311,094 5,927,567 884,520 77,245,119

     

    Mass Transit
    Project FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Unfunded Total
    FDOT
    No Projects
    Monroe County
    No Projects

     

    Ports
    Project FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Unfunded Total
    FDOT
    No Projects
    Monroe County
    No Projects

     

    Aviation Project Project
    Budget
    Appropriated
    As of 9/30/16
    FY 2017
    FY 2018
    FY 2019
    FY 2020
    FY 2021
    Unfunded
    Total
    Marathon Airport
    Sewer Laterals - AQ606 - GAMD69 Aviation
    Preservation
    315,033 309,420 5,613 5,613
    Revenues
    403 - Operating Revenues 3,323 3,323
    403 - State Grants 2,290 2,290
    Total Revenues 5,613 5,613
    Sewer Laterals - 44-31 - AQE35 - GAMA75 Aviation
    Preservation
    685,070 155,105 529,965 529,965
    Revenues
    403 - Operating Revenues 112,059 112,059
    403 - Federal Grants 97,207 97,207
    403 - State Grants 320,699 320,699
    Total Revenues 529,965 529,965
    CBP (Customs) Ph. 2 - AQH10 - GAMD72 Aviation Rev/Ops 500,000 402,458 97,542 97,542
    Customs Expansion - AQE35 - GAMD73 Aviation Rev/Ops 1,300,000 1,279,428 20,572 20,572
    Total Project Expenditures 1,800,000 1,681,886 118,114 118,114
    Revenues
    403 - Operating Revenues 59,057 59,057
    403 - State Grants 59,057 59,057
    Total Revenues 118,114 118,114
    Construction of 11 Replacement Hangars ARK80 - GAMD75 Aviation Rev/Ops 3,525,500 436,915 3,088,585 3,088,585
    Revenues
    403 - Operating Revenues 617,717 617,717
    403 - State Grants 2,470,868 2,470,868
    Total Revenues 3,088,585 3,088,585
    Obstructions Removal RPZ/RW25 - AQE35 - GAMD76 Aviation Safety 18,750 0 18,750 18,750
    Obstruction Removal RPZ/RW25 - 44-34 - GAMA79 144,055 0 144,055 144,055
    Total Project Expenditures 162,805 0 162,805 162,805
    Revenues
    403 - Federal Grants 144,055 144,055
    403 - State Grants 15,000 15,000
    406 - PFC Revenue 3,750 3,750
    Total Revenues 162,805 162,805
    Essential Airport Equipment - GOE76 - GAMD77 Aviation Safety 482,500 0 482,500 482,500
    Revenues
    403 - Operating Revenues 96,500 96,500
    403 - State Grants 386,000 386,000
    Total Revenues 482,500 482,500
    Master Plan Phase 1 - 44-35 & GOE41 - GAMA80 Aviation
    Preservation
    715,085 0 715,085 715,085
    Revenues
    403 - Operating Revenues 15,000 15,000
    403 - Federal Grants 640,085 640,085
    403 - State Grants 60,000 60,000
    Total Revenues 715,085 715,085
    Environmental Assessment - GOE44 - GAMA81 Aviation Safety 562,659 0 562,659 562,659
    Revenues
    403 - Operating Revenues 43,291 43,291
    403 - Federal Grants 449,368 449,368
    403 - State Grants 70,000 70,000
    Total Revenues 562,659 562,659
    Planning Studies - AQE35 - GAMD71 Aviation
    Preservation
    605,000 414,223 36,201 154,576 190,777
    Revenues
    403 - Operating Revenues 7,240 30,915 38,155
    403 - State Grants 28,961 123,661 152,622
    Total Revenues 36,201 154,576 190,777
    Planning Studies - GOI22 - GAMD79 (FY17/FY18) Aviation
    Preservation
    500,000 0 250,000 250,000 500,000
    Revenues
    403 - Operating Revenues 50,000 50,000 100,000
    403 - State Grants 200,000 200,000 400,000
    Total Revenues 250,000 250,000 500,000
    Airport Carwash Facility - GOE88 - GAMD78 Aviation Rev/Ops 625,000 0 0 625,000 625,000
    Revenues
    403 - Operating Revenues 125,000 125,000
    403 - State Grants 500,000 500,000
    Total Revenues 625,000 625,000
    Land Acquisition Aviation Rev/Ops 1,875,000 0 1,875,000 1,875,000
    Revenues
    403 - Operating Revenues 375,000 375,000
    403 - State Grants 1,500,000 1,500,000
    Total Revenues 1,875,000 1,875,000
    Airport Buildings and Security Improvements Aviation Rev/Ops 162,265 0 162,265 162,265
    Revenues
    403 - Operating Revenues 32,453 32,453
    403 - State Grants 129,812 129,812
    Total Revenues 162,265 162,265
    New Storage/Maintenance Building Aviation Rev/Ops 500,000 0 500,000 500,000
    Revenues
    403 - Operating Revenues 100,000 100,000
    403 - State Grants 400,000 400,000
    Total Revenues 500,000 500,000
    Environmental Permitting Aviation Safety 600,000 0 600,000 600,000
    Revenues
    403 - Operating Revenues 12,000 12,000
    403 - Federal Grants 48,000 48,000
    403 - State Grants 540,000 540,000
    Total Revenues 600,000 600,000
    Terminal Expansion Aviation Rev/Ops 2,201,101 0 2,201,101 2,201,101
    403 - Operating Revenues 1,760,881 1,760,881
    403 - State Grants 440,220 440,220
    Total Revenues 4,402,203 4,402,203
    Rental Carwash Facility Aviation Rev/Ops 312,500 0 312,500 312,500
    403 - Operating Revenues 250,000 250,000
    403 - State Grants 62,500 62,500
    Total Revenues 625,000 625,000
    Runway 7-25 Rehab Ph. 2 - Design Aviation
    Preservation
    500,000 0 500,000 500,000
    Revenues
    403 - Operating Revenues 10,000 10,000
    403 - Federal Grants 450,000 450,000
    403 - State Grants 40,000 40,000
    Total Revenues 500,000 500,000
    Runway 7-25 Rehab Ph. 2 - Construction Aviation
    Preservation
    3,000,000 0 3,000,000 3,000,000
    Revenues
    403 - Operating Revenues 60,000 60,000
    403 - Federal Grants 2,700,000 2,700,000
    403 - State Grants 240,000 240,000
    Total Revenues 3,000,000 3,000,000
    Construction 11 Replacement Hangars Aviation Rev/Ops 583,939 0 583,939 583,939
    403 - Operating Revenues 467,151 467,151
    403 - State Grants 116,788 116,788
    Total Revenues 1,167,878 1,167,878
    AWOS Relocation Aviation
    Preservation
    250,000 0 250,000 250,000
    403 - Operating Revenues 200,000 200,000
    403 - State Grants 50,000 50,000
    Total Revenues 500,000 500,000
    Fuel Farm Relocation Aviation Rev/Ops 1,200,000 0 1,200,000 1,200,000
    403 - Operating Revenues 960,000 960,000
    403 - State Grants 240,000 240,000
    Total Revenues 2,400,000 2,400,000
    Taxiway Rehab. & Lighting/New Taxiway Connector Aviation
    Preservation
    370,000 0 370,000 370,000
    403 - Operating Revenues 296,000 296,000
    403 - State Grants 74,000 74,000
    Total Revenues 740,000 740,000
    Misc. Planning Studies Aviation
    Preservation
    375,000 0 375,000 375,000
    403 - Operating Revenues 75,000 75,000
    403 - State Grants 300,000 300,000
    Total Revenues 750,000 750,000
    Runway 7-25 Rehab Ph. 3 - Design Aviation
    Preservation
    750,000 0 750,000 750,000
    Revenues
    403 - Operating Revenues 15,000 15,000
    403 - Federal Grants 675,000 675,000
    403 - State Grants 60,000 60,000
    Total Revenues 750,000 750,000
    Drainage Study Aviation
    Preservation
    276,480 0 276,480 276,480
    Revenues
    403 - Operating Revenues 46,080 46,080
    403 - State Grants 230,400 230,400
    Total Revenues 276,480 276,480
    Pavement Evaluation and Maint. Program Aviation
    Preservation
    343,750 0 343,750 343,750
    Revenues
    403 - Operating Revenues 68,750 68,750
    403 - State Grants 275,000 275,000
    Total Revenues 343,750 343,750
    Design and Construct Hangars Aviation Rev/Ops 1,835,520 0 1,835,520 1,835,520
    Revenues
    403 - Operating Revenues 305,920 305,920
    403 - State Grants 1,529,600 1,529,600
    Total Revenues 1,835,520 1,835,520
    Total Marathon Airport 25,114,207 2,997,549 5,951,527 4,166,841 3,013,601 5,778,939 3,205,750 0 22,116,659
    Key West International Airport
    KW Planning Studies AQE35 - GAKD128 Aviation Rev/Ops 1,576,400 1,382,576 193,824 193,824
    Revenues
    404 - Operating Revenues 96,912 96,912
    404 - State Grants 96,912 96,912
    Total Revenues 193,824 193,824
    KW CUSTOMS - AQH10 - GAKD129 Aviation Rev/Ops 1,119,148 160,673 958,475 958,475
    Revenues
    404 - Operating Revenues 479,238 479,238
    404 - State Grants 479,238 479,238
    Total Revenues 958,475 958,475
    Customs Rehab. Ph. 2 - 37-47 - AQE35 - GAKA156 Aviation Safety 700,922 75,857 625,065 625,065
    Revenues
    404 - Operating Revenues 3,793 31,253 31,253
    404 - Federal Grants 68,272 562,558 562,558
    404 - State Grants 3,793 31,253 31,253
    Total Revenues 75,857 625,065 625,065
    Drainage Reconstruction 37-47 - AQE35 - GAKA158 Aviation Safety 577,200 471,991 105,209 105,209
    Revenues
    404 - Operating Revenues 23,600 5,260 5,260
    404 - Federal Grants 424,792 94,688 94,688
    404 - State Grants 23,600 5,260 5,260
    Total Revenues 471,991 105,209 105,209
    EMAS RNWY 27 Construction 37-47 - AQE35 - GAKAP143 Aviation Safety 4,519,225 4,430,147 89,079 89,079
    Revenues
    404 - Operating Revenues 221,507 4,454 4,454
    404 - Federal Grants 3,987,132 80,171 80,171
    404 - State Grants 221,507 4,454 4,454
    Total Revenues 4,430,147 89,079 89,079
    Master Plan Study 37-51 - GO562 - GAKAP144 Aviation
    Preservation
    864,955 293,845 571,110 571,110
    Revenues
    404 - Operating Revenues 28,556 28,556
    404 - Federal Grants 513,999 513,999
    404 - State Grants 28,556 28,556
    Total Revenues 571,110 571,110
    Rehab. Apron - Design - 37-49 - AQE35 - GAKAP145 Aviation
    Preservation
    265,485 261,353 4,132 4,132
    Revenues
    404 - Operating Revenues 207 207
    404 - Federal Grants 3,719 3,719
    404 - State Grants 207 207
    Total Revenues 4,132 4,132
    Drainage Ph. 2 & 3 - Design - 37-49 - AQE35 - GAKAP146 Aviation
    Preservation
    246,900 240,949 5,951 5,951
    Revenues
    404 - Operating Revenues 298 298
    404 - Federal Grants 5,356 5,356
    404 - State Grants 298 298
    Total Revenues 5,951 5,951
    Wetlands Mitigation - Monitoring GAKAP147 Aviation
    Preservation
    500,000 44,900 455,100 455,100
    Revenues
    406 - PFC Revenue 455,100 455,100
    Total Revenues 455,100 455,100
    Security & Misc. Fence Improvements - GO553 - GAKD134 Aviation Safety 555,480 86,834 468,646 468,646
    Revenues
    404 - Operating Revenues 234,323 234,323
    404 - State Grants 234,323 234,323
    Total Revenues 468,646 468,646
    Noise Mitigation Measures Initial Testing 37-50 - GAKA160 Aviation
    Preservation
    584,261 584,211 50 50
    Revenues
    404 - Operating Revenues 5 5
    404 - Federal Grants 45 45
    Total Revenues 50 50
    Noise Insulation Prgm. Phase 1 Design 37-52 GAKA161 Aviation
    Preservation
    1,427,501 0 1,427,501 1,427,501
    Revenues
    404 - Operating Revenues 142,750 142,750
    404 - Federal Grants 1,284,751 1,284,751
    Total Revenues 1,427,501 1,427,501
    Drainage Phases 2 & 3 Construction 37-53 GOE45 - GAKAP149 Aviation
    Preservation
    2,041,446 0 2,041,446 2,041,446
    Revenues
    404 - Operating Revenues 105,000 105,000
    404 - Federal Grants 1,831,446 1,831,446
    404 - State Grants 105,000 105,000
    Total Revenues 2,041,446 2,041,446
    Rehab. Runway 9-27 & Lighting Design 37-53 - GOE40 GAKA162 Aviation
    Preservation
    677,803 0 677,803 677,803
    Revenues
    404 - Operating Revenues 34,000 34,000
    404 - Federal Grants 609,803 609,803
    404 - State Grants 34,000 34,000
    Total Revenues 677,803 677,803
    Baggage Handling System Upgrade - GAKAP150 Aviation Safety 450,000 0 450,000 450,000
    Revenues
    406 - PFC Revenue 450,000 450,000
    Total Revenues 450,000 450,000
    Emergency Alert System - GAKAP151 Aviation Safety 350,000 0 350,000 350,000
    Revenues
    406 - PFC Revenue 350,000 350,000
    Total Revenues 350,000 350,000
    KW Planning Studies - GOE77 - GAKD135 Aviation
    Preservation
    600,000 0 600,000 600,000
    Revenues
    404 - Operating Revenues 300,000 300,000
    404 - State Grants 300,000 300,000
    Total Revenues 600,000 600,000
    Essential Airport Equipment - GOE47 - GAKD136 Aviation Safety 1,400,000 0 700,000 700,000 1,400,000
    Revenues
    404 - Operating Revenues 350,000 350,000 700,000
    404 - State Grants 350,000 350,000 700,000
    Total Revenues 700,000 700,000 1,400,000
    Strengthen/Rehab. Apron Construction 37-53 GOE46 - GAKAP148 Aviation
    Preservation
    10,107,485 0 5,053,743 5,053,743 10,107,485
    Revenues
    404 - Operating Revenues 255,000 255,000 510,000
    404 - Federal Grants 4,543,743 4,543,743 9,087,485
    404 - State Grants 255,000 255,000 510,000
    Total Revenues 5,053,743 5,053,743 10,107,485
    KW Planning Studies Aviation
    Preservation
    600,000 0 600,000 600,000
    Revenues
    404 - Operating Revenues 300,000 300,000
    404 - State Grants 300,000 300,000
    Total Revenues 600,000 600,000
    Airport Buildings & Security Improvements Aviation Safety 460,000 0 460,000 460,000
    Revenues
    404 - Operating Revenues 230,000 230,000
    404 - State Grants 230,000 230,000
    Total Revenues 460,000 460,000
    Photovoltaics Design GOI57 - GAKD138 Aviation
    Preservation
    400,000 0 400,000 400,000
    Revenues
    404 - State Grants 20,000 20,000
    406 - PFC Revenues 380,000 380,000
    Total Revenues 400,000 400,000
    Terminal Improvements - Construction Aviation Rev/Ops 260,000 0 260,000 260,000
    Revenues
    404 - Operating Revenues 130,000 130,000
    404 - State Grants 130,000 130,000
    Total Revenues 260,000 260,000
    Customs Expansion Ph. 3 - AQH10 Aviation Safety 6,028,000 0 3,014,000 3,014,000 6,028,000
    Revenues
    404 - Operating Revenues 1,507,000 1,507,000 3,014,000
    404 - State Grants 1,507,000 3,014,000
    Total Revenues 3,014,000 3,014,000 6,028,000
    NIP 1 Construction - Bldg. B & 3SF Aviation
    Preservation
    7,200,000 0 3,600,000 3,600,000 7,200,000
    Revenues
    404 - Federal Grants 1,800,000 1,800,000 3,600,000
    406 - PFC Revenue 1,800,000 1,800,000 3,600,000
    Total Revenues 3,600,000 3,600,000 7,200,000
    Runway Rehab & Lighting Construction Aviation Safety 8,750,000 0 4,375,000 4,375,000 8,750,000
    Revenues
    404 - Federal Grants 3,937,500 3,937,500 7,875,000
    404 - State Grants 218,750 218,750 437,500
    406 - PFC Revenue 218,750 218,750 437,500
    Total Revenues 4,375,000 4,375,000 8,750,000
    Terminal Improvements (Chillers/Photovoltaics) Construction Aviation
    Preservation
    2,450,000 0 2,450,000 2,450,000
    Revenues
    404 - State Grants 122,500 122,500
    406 - PFC Revenue 2,327,500 2,327,500
    Total Revenues 2,450,000 2,450,000
    Taxiway Rehab and Lighting - Design Aviation
    Preservation
    550,000 0 550,000 550,000
    Revenues
    404 - Operating Revenues 27,500 27,500
    404 - Federal Grants 495,000 495,000
    404 - State Grants 27,500 27,500
    Total Revenues 550,000 550,000
    Rental Carwash Facility Aviation Rev/Ops 500,000 0 500,000 500,000
    Revenues
    404 - Operating Revenues 250,000 250,000
    404 - State Grants 250,000 250,000
    Total Revenues 500,000 500,000
    Vehicle Fleet Upgrade and Conversion Aviation Rev/Ops 1,500,000 0 750,000 750,000 1,500,000
    Revenues
    404 - Operating Revenues 375,000 375,000 750,000
    404 - State Grants 375,000 375,000 750,000
    Total Revenues 750,000 750,000 1,500,000
    Public Parking Expansion Aviation Rev/Ops 1,000,000 0 500,000 500,000 1,000,000
    Revenues
    404 - Operating Revenues 250,000 250,000 500,000
    404 - State Grants 250,000 250,000 500,000
    Total Revenues 500,000 500,000 1,000,000
    Terminal Expansion and Rehab. Aviation Rev/Ops 2,000,000 0 1,000,000 1,000,000 2,000,000
    Revenues
    404 - Operating Revenues 500,000 500,000 1,000,000
    404 - State Grants 500,000 500,000 1,000,000
    Total Revenues 1,000,000 1,000,000 2,000,000
    NIP 2 Construction - Bldg. C Aviation
    Preservation
    9,000,000 0 4,500,000 4,500,000 9,000,000
    Revenues
    404 - Federal Grants 4,050,000 4,050,000 8,100,000
    406 - PFC Revenue 450,000 450,000 900,000
    Total Revenues 4,500,000 4,500,000 9,000,000
    Taxiway Rehab and Lighting - Construction Aviation
    Preservation
    6,500,000 0 3,250,000 3,250,000 6,500,000
    Revenues
    404 - Federal Grants 2,925,000 2,925,000 5,850,000
    404 - Federal Grants 162,500 162,500 325,000
    404 - State Grants 162,500 162,500 325,000
    Total Revenues 3,250,000 3,250,000 6,500,000
    Essential Airport Equipment Aviation Safety 100,000 0 100,000 100,000
    Revenues
    404 - Operating Revenues 50,000 50,000
    404 - State Grants 50,000 50,000
    Total Revenues 100,000 100,000
    Runway Shoulder Widening Aviation Rev/Ops 630,000 0 630,000 630,000
    Revenues
    404 - Operating Revenues 315,000 315,000
    404 - State Grants 315,000 315,000
    Total Revenues 630,000 630,000
    Misc. Planning Studies Aviation
    Preservation
    800,000 0 800,000 800,000
    Revenues
    404 - Operating Revenues 400,000 400,000
    404 - State Grants 400,000 400,000
    Total Revenues 800,000 800,000
    Rehab. & Expand Terminal Facilities Aviation Rev/Ops 3,273,698 0 1,636,849 1,636,849 3,273,698
    Revenues
    404 - Operating Revenues 818,425 818,425 1,636,849
    404 - State Grants 818,425 818,425 1,636,849
    Total Revenues 1,636,849 1,636,849 3,273,698
    NIP 2 Construction - Bldg. A Aviation
    Preservation
    6,900,000 0 3,450,000 3,450,000 6,900,000
    Revenues
    404 - Federal Grants 3,105,000 3,105,000 6,210,000
    406 - PFC Revenue 345,000 345,000 690,000
    Total Revenues 3,450,000 3,450,000 6,900,000
    Pavement and Evaluation & Maintenance Program Aviation
    Preservation
    600,000 0 600,000 600,000
    Revenues
    404 - Operating Revenues 300,000 300,000
    404 - State Grants 300,000 300,000
    Total Revenues 600,000 600,000
    Essential Safety and Security Equipment Aviation Safety 100,000 0 100,000 100,000
    Revenues
    404 - Operating Revenues 50,000 50,000
    404 - State Grants 50,000 50,000
    Total Revenues 100,000 100,000
    Land Use Planning/Development Aviation
    Preservation
    250,000 0 250,000 250,000
    Revenues
    404 - Operating Revenues 125,000 125,000
    404 - State Grants 125,000 125,000
    Total Revenues 250,000 250,000
    Perimeter Fencing and Patrol Road Aviation Safety 1,500,000 0 1,500,000 1,500,000
    Revenues
    404 - Operating Revenues 750,000 750,000
    404 - State Grants 750,000 750,000
    Total Revenues 1,500,000 1,500,000
    Customs Expansion Aviation Safety 1,778,000 0 1,778,000 1,778,000
    Revenues
    404 - Operating Revenues 889,000 889,000
    404 - State Grants 889,000 889,000
    Total Revenues 1,778,000 1,778,000
    Total Key West International Airport 90,193,910 8,033,335 14,777,134 18,462,743 24,489,000 16,616,849 7,814,849 82,160,574
    Total-Aviation 115,308,117 11,030,884 20,728,661 22,629,584 27,502,601 22,395,788 11,020,599 104,277,233

     

    Potable Water (Policy 701.1.1)
    Project Title Project
    Budget
    Appropriated
    As of 9/30/16
    FY 2017
    FY 2018
    FY 2019
    FY 2020
    FY 2021
    Total
    Florida Keys Aquaduct Authority
    Distribution Replacement 9,000,000 2,000,000 2,000,000 1,000,000 1,000,000 3,000,000 9,000,000
    Transmission main underneath Snake Creek 6,000,000 1,000,000 5,000,000 -
    -
    6,000,000
    Transmission Main Improvements-C-905 Key Largo 9,000,000 3,000,000 6,000,000 -
    -
    -
    9,000,000
    Transmission Main Bridge Crossing Over C-111 1,800,000 1,800,000 -
    -
    -
    -
    1,800,000
    Stock Island Pump Station Improvements 900,000 900,000 -
    -
    -
    -
    900,000
    Marathon Service Building 2,000,000 -
    1,000,000 1,000,000 2,000,000
    Chlorination System Improvements-Florida City 400,000 400,000 -
    -
    -
    -
    400,000
    Pipe materials for near-term bridge failure 600,000 500,000 100,000 600,000
    New Seawater Reverse Osmosis Plant-Stock Island 19,500,000 1,500,000 9,000,000 9,000,000 -
    -
    19,500,000
    Transmission main under Niles Channel 7,500,000 -
    -
    1,000,000 6,500,000 -
    7,500,000
    Navy Projects
    Water mains, hydrants and meters-Sigsbee 1,650,000 -
    -
    550,000 550,000 550,000 1,650,000
    Water mains, hydrants and meters-Boca Chica 550,000 550,000 -
    -
    -
    -
    550,000
    Demo/Replace Storage Tank #69 Trumbo Point 550,000 550,000 -
    -
    -
    550,000
    Priority but Non-Critical Facilities
    Land Purchase -North & West of FL City WTP 3,000,000 -
    -
    -
    3,000,000 -
    3,000,000
    Servers and Server Room-Florida City 250,000 -
    -
    250,000 -
    -
    250,000
    Service Building -Ramrod booster pump station 225,000 -
    -
    -
    200,000 25,000 225,000
    Exhaust air treatment for large generators 175,000 125,000 50,000 175,000
    Security systems for critical facilites 175,000 -
    -
    150,000 25,000 -
    175,000
    Total - FKAA 63,275,000 10,775,000 18,700,000 16,950,000 12,275,000 4,575,000 63,275,000
    Revenues - FKAA 63,275,000 10,775,000 18,700,000 16,950,000 12,275,000 4,575,000 63,275,000
    Monroe County Projects
    No Projects
    Total 63,275,000 -
    10,775,000 18,700,000 16,950,000 12,275,000 4,575,000 63,275,000

     

    Solid Waste (Policy 801.1.1)
    Project Title Project
    Budget
    Appropriated
    As of 9/30/16
    FY 2017
    FY 2018
    FY 2019
    FY 2020
    FY 2021
    Total
    Renovation of Transf Stn Bldg-Cudjoe Transf Stn 334,000 -
    334,000 -
    -
    -
    -
    334,000
    Revenues
    414 - MSD Fund Charges for Service 334,000 -
    -
    -
    -
    334,000
    Renovation of Transf Stn Bldg-Long Key Transf Stn 333,000 -
    333,000 -
    -
    -
    -
    333,000
    Revenues
    414 - MSD Fund Charges for Service 333,000 -
    -
    -
    -
    333,000
    Renovation of Transf Stn Bldg-Key Largo Transf Stn 333,000 -
    333,000 -
    -
    -
    -
    333,000
    Revenues
    414 - MSD Fund Charges for Service 333,000 -
    -
    -
    -
    333,000
    Total 1,000,000 -
    1,000,000 -
    -
    -
    -
    1,000,000

     

    Sanitary Sewer (Policy 901.1.1)
    Project Title Project
    Budget
    Appropriated
    As of 9/30/16
    FY 2017
    FY 2018
    FY 2019
    FY 2020
    FY 2021
    Total
    Florida Keys Aquaduct Authority
    Key Haven Collection System Improvements 8,400,000 -
    4,400,000 4,000,000 -
    -
    -
    8,400,000
    Navy System upgrades for WW Pumping Systems 450,000 -
    250,000 100,000 50,000 50,000 450,000
    WW Privitazation-Big Coppitt Connection/Expansion 5,550,000 4,800,000 750,000 -
    -
    -
    5,550,000
    Layton (E & W Long Key) WW Collection Sys Expansion 800,000 -
    800,000 -
    -
    -
    800,000
    Total - FKAA 15,200,000 -
    9,450,000 5,550,000 100,000 50,000 50,000 15,200,000
    Revenues - FKAA 15,200,000 -
    9,450,000 5,550,000 100,000 50,000 50,000 15,200,000
    Monroe County Projects
    Wastewater Upgrade to County Owned Facilities 1,158,007 257,164 900,843 -
    -
    -
    -
    900,843
    Revenues
    304 - Infrastructure Sales Surtax 900,843 -
    -
    -
    -
    900,843
    Cudjoe Regional Wastewater System 187,000,000 137,798,051 28,014,096 21,187,853 -
    -
    -
    49,201,949
    Revenues
    312 - Cudjoe Regional WW Capital Fund Cap Assessments -
    -
    -
    -
    -
    -
    125 - State Grants-Mayfield -
    -
    -
    -
    -
    -
    125 - Federal Grants-EPA Onsite Systems 1,300,000 1,300,000 -
    -
    -
    2,600,000
    312 - CWSRF-Loan 26,714,096 19,887,853 -
    -
    -
    46,601,949
    304 - Infrastructure Sales Surtax -
    -
    -
    -
    -
    -
    Total Revenues 28,014,096 21,187,853 -
    -
    -
    49,201,949
    Total 203,358,007 138,055,215 38,364,939 26,737,853 100,000 50,000 50,000 65,302,792

     

    Drainage and Stormwater (Policy 1001.1.1)
    Project Title Project
    Budget
    Appropriated
    As of 9/30/16
    FY 2017
    FY 2018
    FY 2019
    FY 2020
    FY 2021
    Total
    Florida Department of Transportation
    Countywide Drainage Push Button 2,359,674 10,000 616,200 10,000 596,733 -
    1,232,933
    Subtotal - FDOT 10,000 616,200 10,000 596,733 -
    1,232,933
    Revenues - FDOT 10,000 616,200 10,000 596,733 -
    1,232,933
    Monroe County
    Total 2,359,674 -
    10,000 616,200 10,000 596,733 -
    1,232,933

     

    Parks and Recreation (Policy 1201.1.1)
    Project Title Project
    Budget
    Appropriated
    As of 9/30/16
    FY 2017
    FY 2018
    FY 2019
    FY 2020
    FY 2021
    Total
    Higgs Beach Master Plan 3,475,339 333,723 1,033,920 1,000,000 1,107,696 -
    -
    3,141,616
    Revenues
    304 - Infrastructure Sales Surtax 1,033,920 1,000,000 1,107,696 -
    -
    3,141,616
    -
    Bernstein Park 5,323,356 348,568 3,831,670 1,143,118 -
    -
    -
    4,974,788
    Revenues
    314 - Series 2014 Rev Bonds 3,831,670 1,143,118 -
    -
    -
    4,974,788
    Old Seven Mile Bridge 2,700,000 -
    2,700,000 -
    -
    -
    -
    2,700,000
    Revenues
    304 - Infrastructure Sales Surtax 2,700,000 -
    -
    -
    -
    2,700,000
    Big Pine Swimming Hole 2,025,725 17,150 108,575 1,900,000 -
    -
    -
    2,008,575
    Revenues
    304 - Infrastructure Sales Surtax (local match) 25,725 1,000,000 -
    -
    -
    1,025,725
    125 - State Grants 82,850 900,000 -
    -
    -
    982,850
    Total Project Revenues 108,575 1,900,000 -
    -
    -
    2,008,575
    Barcelona (Gulf View) Boat Ramp 186,877 180 185,757 -
    -
    -
    -
    185,757
    Revenues
    304 - Infrastructure Sales Surtax 185,757 -
    -
    -
    -
    185,757
    State Road 4A Boat Ramp 154,293 97,121 57,172 -
    -
    -
    -
    57,172
    Revenues
    304 - Infrastructure Sales Surtax 57,172 -
    -
    -
    -
    57,172
    Total 13,865,590 796,742 7,917,094 4,043,118 1,107,696 -
    -
    13,067,908

     

    Land Development & Land Acquisition (Goal 105, Objectives 101.7 & 102.4)
    Project Title Project
    Budget
    Appropriated
    As of 9/30/16
    FY 2017
    FY 2018
    FY 2019
    FY 2020
    FY 2021
    Total
    Monroe County Land Authority -
    Land Acquisition-FI Keys ACSC 4,111,350 -
    -
    -
    -
    4,111,350
    ROGO Reserves 4,095,873 -
    -
    -
    -
    4,095,873
    Total 8,207,223 -
    -
    -
    -
    8,207,223
    Revenues
    Tourist Impact Tax 1,520,000 1,520,000
    State Park Surcharge 450,000 450,000
    Monroe County Land Authority Fund Balance 6,237,223 6,237,223
    Total Revenues 8,207,223 -
    -
    -
    -
    8,207,223
    Monroe County
    Land Acquisition Match 10,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000
    Revenues
    304 - Infrastructure Sales Surtax 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000
    Total 10,207,223 2,000,000 2,000,000 2,000,000 2,000,000 18,207,223

     

    General Government
    Project Title Project
    Budget
    Appropriated
    As of 9/30/16
    FY 2017
    FY 2018
    FY 2019
    FY 2020
    FY 2021
    Total
    General Government Function Projects
    Jefferson Browne Building Rehabilitation 4,539,312 88,930 1,500,000 2,943,982 -
    -
    -
    4,443,982
    Revenues
    314 - 2014 Series Revenue Bonds 1,500,000 2,943,982 -
    -
    -
    4,443,982
    HHP Equipment Shed 34,465 12,065 22,400 -
    -
    -
    -
    22,400
    Revenues
    304 - Infrastructure Sales Surtax 22,400 -
    -
    -
    -
    22,400
    Harvey Gov Center Painting & Repairs 317,825 120,105 197,720 -
    -
    -
    -
    197,720
    Revenues
    304 - Infrastructure Sales Surtax 197,720 -
    -
    -
    -
    197,720
    Harvey Gov Center Nutritian Site 602,487 156,677 233,268 200,000 -
    -
    -
    433,268
    Revenues
    304 - Infrastructure Sales Surtax 233,268 200,000 -
    -
    -
    433,268
    Stock Island Fire Station Repairs 20,000 20,000 -
    -
    -
    -
    20,000
    Revenues
    304 - Infrastructure Sales Surtax 20,000 -
    -
    -
    -
    20,000
    Marathon Annex Spalling 150,200 5,600 144,600 -
    -
    -
    -
    144,600
    Revenues
    304 - Infrastructure Sales Surtax 144,600 -
    -
    -
    -
    144,600
    MCSO Admin Window Replacement 230,000 230,000 -
    -
    -
    -
    230,000
    Revenues
    304 - Infrastructure Sales Surtax 230,000 -
    -
    -
    -
    230,000
    Energy Retrofit 81,000 81,000 -
    -
    -
    -
    81,000
    Revenues
    304 - Infrastructure Sales Surtax 81,000 -
    -
    -
    -
    81,000
    Stock Island Jail Replace Security Fencing 220,000 220,000 -
    -
    -
    -
    220,000
    Revenues
    304 - Infrastructure Sales Surtax 220,000 220,000
    KL Park Duplex Spalling 115,183 35,953 79,230 -
    -
    -
    -
    79,230
    Revenues
    304 - Infrastructure Sales Surtax 79,230 -
    -
    -
    -
    79,230
    VOIP Telephone System 880,000 880,000 -
    -
    -
    -
    880,000
    Revenues
    304 - Infrastructure Sales Surtax 880,000 -
    -
    -
    -
    880,000
    Trapeze Software 50,000 50,000 -
    -
    -
    -
    50,000
    Revenues
    304 - Infrastructure Sales Surtax 50,000 -
    -
    -
    -
    50,000
    Marathon Government Center New Roof 190,000 190,000 -
    -
    -
    -
    190,000
    Revenues
    304 - Infrastructure Sales Surtax 190,000 -
    -
    -
    -
    190,000
    Facilities Maintenance CIPP Lining Roof Leaders 400,000 -
    400,000 -
    -
    -
    400,000
    Revenues
    304 - Infrastructure Sales Surtax -
    400,000 -
    -
    -
    400,000
    MCDC HVAC 2,466,549 2,466,549 -
    -
    -
    -
    2,466,549
    Revenues
    304 - Infrastructure Sales Surtax 1,466,549 -
    -
    -
    -
    1,466,549
    308 - 2007 Revenue Bond 1,000,000
    Correction Facilities 280,766 280,766 -
    -
    -
    -
    280,766
    Revenues
    304 - Infrastructure Sales Surtax 280,766 -
    -
    -
    -
    280,766
    SPCA 750,000 750,000 -
    -
    -
    -
    750,000
    Revenues
    304 - Infrastructure Sales Surtax 750,000 -
    -
    -
    -
    750,000
    Various Public Works Projects 600,000 600,000 -
    -
    -
    -
    600,000
    Revenues
    304 - Infrastructure Sales Surtax 600,000 -
    -
    -
    -
    600,000
    -
    Total-General Government Function 11,927,787 419,330 7,945,533 3,543,982 -
    -
    -
    11,489,515
    Public Safety Function Projects
    MCDC Sprinkler Piping Replacement 233,261 35,615 47,127 -
    -
    -
    -
    47,127
    Revenues
    304 - Infrastructure Sales Surtax 47,127 -
    -
    -
    -
    47,127
    MCDC Control System Update 255,000 -
    255,000 -
    -
    -
    -
    255,000
    Revenues
    304 - Infrastructure Sales Surtax 255,000 -
    -
    -
    -
    255,000
    Key Largo Fire Vehicle & Hydrants 997,025 247,025 150,000 150,000 150,000 150,000 150,000 750,000
    Revenues
    304 - Infrastructure Sales Surtax 150,000 150,000 150,000 150,000 150,000 750,000
    Summerland Key Fire Station 4,284,545 499,545 3,785,000 -
    -
    -
    -
    3,785,000
    Revenues
    314 - 2014 Series Revenue Bonds 3,785,000 -
    -
    -
    -
    3,785,000
    Fire Training Academy-Crawl Key 2,094,021 1,092,120 1,001,901 -
    -
    -
    -
    1,001,901
    Revenues
    314 - 2014 Series Revenue Bonds 1,001,901 -
    -
    -
    -
    1,001,901
    Habitat for Humanity 21,863 19,163 2,700 -
    -
    -
    -
    2,700
    Revenues
    304 - Infrastructure Sales Surtax 2,700 -
    -
    -
    -
    2,700
    Bernstein Park 5,323,356 22,961 1,143,118 -
    -
    -
    -
    1,143,118
    Revenues
    304 - Infrastructure Sales Surtax 1,143,118 -
    -
    -
    -
    1,143,118
    Sugarloaf Fire Station 3,500,000 500,000 3,000,000 -
    -
    3,500,000
    Revenues
    314 - 2014 Series Revenue Bonds 500,000 3,000,000 -
    -
    3,500,000
    MCDC Sprinkler Replacement 82,743 35,615 47,127 -
    -
    -
    -
    47,127
    Revenues
    304 - Infrastructure Sales Surtax 47,127 -
    -
    -
    -
    47,127
    Trapeze Software 50,000 50,000 -
    -
    -
    -
    50,000
    Revenues
    304 - Infrastructure Sales Surtax 50,000 -
    -
    -
    -
    50,000
    Fire Hydrants - Key Largo 997,025 247,025 150,000 150,000 150,000 150,000 150,000 750,000
    Revenues
    304 - Infrastructure Sales Surtax 150,000 150,000 150,000 150,000 150,000 750,000
    Total-Public Safety Function 17,838,839 2,199,069 6,631,973 800,000 3,300,000 300,000 300,000 11,331,973
    Physical Environment Function Projects
    Canal Master Plan 8,983,342 4,707,938 2,275,404 2,000,000 -
    -
    -
    4,275,404
    Revenues
    304 - Infrastructure Sales Surtax 2,275,404 2,000,000 -
    -
    -
    4,275,404
    Total-Physical Environment Function 8,983,342 4,707,938 2,275,404 2,000,000 -
    -
    -
    4,275,404
    Economic Environment Function Projects
    Gulf Seafood Land Acquisition 7,000,000 7,000,000 -
    -
    -
    -
    7,000,000
    Revenues
    125 - State Grants 2,000,000 -
    -
    -
    -
    2,000,000
    304 - Infrastructure Sales Surtax 5,000,000
    Total-Economic Environment Function 7,000,000 -
    7,000,000 -
    -
    -
    -
    7,000,000
    Marathon Library 5,862,258 188,055 2,002,000 -
    3,672,203 -
    -
    5,674,203
    Revenues
    314 - 2014 Series Revenue Bonds 2,002,000 -
    3,672,203 -
    -
    5,674,203
    T otal Culture & Recreation Function 5,862,258 188,055 2,002,000 -
    3,672,203 -
    -
    5,674,203
    Court Related Function Projects
    PK Courthouse & Jail 26,494,638 553,814 6,338,092 19,562,340 -
    25,900,432
    Revenues
    314 - 2014 Series Revenue Bonds 6,338,092 19,562,340 -
    -
    25,900,432
    Total Court Related Function 26,494,638 553,814 6,338,092 -
    19,562,340 -
    -
    25,900,432
    -
    Total 78,106,864 8,068,206 32,193,002 6,343,982 26,534,543 300,000 300,000 65,671,527

     