§ 122-3. Permit Requirements.  


Latest version.
  • (a)

    The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

    Adjacent to contiguous native habitat means an area of native habitat sharing a boundary at one or more points of intersection with other native habitat. For purposes of this land development code, an intervening road, right-of-way or easement shall not destroy the adjacency of the habitat. However, U.S. 1, canals and open water shall constitute a break in adjacency.

    Alteration means any change or modification in construction type, materials, or occupancy.

    Base flood means the flood having a one percent chance of being equaled or exceeded in any given year.

    Basement means any area of the building having its floor subgrade (below ground level) on all sides.

    Development means any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, clearing, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials.

    Elevated building means a nonbasement building that has its lowest elevated floor raised above ground level by foundation walls, shear walls, posts, piers, pilings, or columns.

    Enclosure means that portion of an elevated building below the lowest elevated floor that is either partially or fully shut in by rigid walls and used solely for limited storage, parking or entryways. Enclosures shall not be constructed, equipped or used for habitational or other purposes.

    Existing construction means structures for which the start of construction commenced before January 1, 1975. Existing construction is also known as pre-FIRM structures.

    Existing manufactured home park means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of the streets, and either final site grading or the pouring of concrete pads is completed before January 1, 1975, and in which, at the time of application, there are no site built residences or the park or subdivision is limited to manufactured home by this chapter.

    Finishing materials means anything beyond basic wall construction pursuant to the most recent FEMA Technical Bulletin, which is normally associated with habitable space. Finishing materials include, but are not limited to, ceiling mold, trim, baseboards, decorative finish work, wainscoting, and textured woods.

    Historic structure means any structure that is:

    (a)

    Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;

    (b)

    Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;

    (c)

    Individually listed on state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or

    (d)

    Individually listed on a county inventory of historic places in communities with historic preservation programs that have been certified either:

    (1)

    By an approved state program as determined by the Secretary of the Interior, or

    (2)

    Directly by the Secretary of the Interior in states without approved programs.

    Illegal structure or use means a structure or use that is not a legal structure or legal use as defined in this chapter.

    Legal structure means a structure that was permitted by the floodplain regulation in effect at the time construction commenced on the structure in its current configuration and received a permit or final inspection or certificate of occupancy for the structure in its current configuration.

    Legal use means a use that was permitted by the floodplain regulations at the time the use commenced on the property.

    Limited storage means that which is incidental and accessory to the principal use of the structure. For example, if the structure is a residence, storage should be limited to items such as lawn and garden equipment, tires, and other low damage items which will not suffer flood damage or can be conveniently moved to the elevated part of the building. Flood insurance coverage for enclosures below the base flood elevation (BFE) is very limited.

    Lowest floor means the lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area is not considered a building's lowest floor; provided, that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements of this chapter.

    Manufactured home means a structure, transportable in one or more sections, which is built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term also includes park trailer, travel trailers, and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property.

    Market value means the county property appraiser's value of the structure plus 20 percent. A uniform appraisal report for determination of market value submitted by the applicant may be used if the county Building Official considers such appraisal consistent with local construction costs. Where appraisal is not accepted because it appears to be inconsistent with local construction costs an applicant may request review by an independent third party appraiser duly authorized by the county. The cost of independent review shall be borne by the applicant. The reviewing appraiser shall determine if the appraisal value reasonably reflects an appropriate value of the structure. The independent appraiser's determination shall be in writing. Professionals preparing appraisal shall be required to possess certifications as state certified residential appraisers for appraising one to four family residential properties and state certified general appraisers for all other properties including commercial and multi-residential.

    New construction means those structures for which the start of construction commenced on or after January 1, 1975. New construction is also knows as post-FIRM structures.

    Nonconforming structure means a below base flood elevation structure or a portion thereof (such as an enclosure, materials with no openings, flood resistant materials), which was lawfully existing or permitted, and is not fully compliant with the terms of this chapter. A nonconforming structure shall remain subject to the terms of this chapter.

    Notice to proceed means written authorization by the county growth management division to the permittee authorizing permitted development to begin.

    Pure manufactured home park means a manufactured home park that at the time of application has no site-built residences or a park or subdivision which is limited to manufactured homes only by this chapter.

    Recreational vehicle means a vehicle that is:

    (1)

    Built on a single chassis;

    (2)

    Four hundred square feet or less when measured at the largest horizontal projection;

    (3)

    Designed to be self-propelled or permanently towable by a light duty truck; and

    (4)

    Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel or seasonal use.

    Start of construction means (for other than new construction or substantial improvements under the Coastal Barrier Resources Act) includes substantial improvements, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement or other improvement was within 180 days of the permit date. For substantial improvements the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building whether or not the alteration affects the external dimensions of the building. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure.

    Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to it's before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred. All structures that are determined to be substantially damaged are automatically considered to be substantial improvements, regardless of the actual repair work performed. If the cost necessary to fully repair the structure to its before damage condition is equal to or greater than 50 percent of the structure's market value before damages, then the structure must be elevated (or flood proofed if it is non-residential) to or above the base flood elevation (BFE), and meet other applicable NFIP requirements. Items that may be excluded from the cost to repair include plans, specifications, survey costs, permit fees, and other items which are separate from the repair. Items that may also be excluded include demolition or emergency repairs (costs to temporarily stabilize a building so that it's safe to enter to evaluate and identify required repairs) and improvements to items outside the building, such as the driveway, septic systems, wells, fencing, landscaping and detached structures.

    Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the "start of construction" of the improvement. This term includes structures which have incurred "substantial damage, "regardless of the actual repair work performed. The term does not, however, include either:

    (a)

    Any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local Building Official and which are the minimum necessary to assure safe living conditions; or

    (b)

    The cost of repairs required to remedy health, safety, and sanitary code deficiencies can be deducted from the overall cost of an improvement, but only if:

    (1)

    An appropriate regulatory official such as a Building Official, Fire Marshal, or Health Officer was informed about and knows the extent of the code related deficiencies, and

    (2)

    The deficiency was in existence prior to the damage event or improvement and will not be triggered solely by the fact that the structure is being improved or repaired.

    In addition, for any repair required to meet health, sanitary, and safety codes, only the minimum necessary to assure safe living conditions should be deducted, including those improvements required by Chapter 11, 2012 Florida Accessibility Code. Costs of repairs that are in excess of the minimum necessary for continued occupancy or use will be counted toward the cost of the overall improvement; or

    (c)

    Any alterations of a "historic structure," provided that the alteration will not preclude the structure's continued designation as a "historic structure."

    Floodplain management requirements for new construction apply to substantial improvements.

    Supplemental information for substantial improvement.

    The basic types of improvements the could be made to structures include but are not limited to rehabilitations or reconstructions that do not increase square footage, and lateral or vertical additions that do increase square footage.

    Rehabilitation or reconstruction would be a partial or complete "gutting" and replacement of internal workings and may or may not include structural changes. If this action is substantial, i.e., over 50 percent of the structure's market value, it is considered new construction, and the entire building must be elevated to or above the base flood elevation (BFE) (or floodproofed if the building is non-residential).

    For a lateral addition, if the substantial improvement is to add a room or rooms outside the footprint of the existing building, only the addition is required to be elevated to or above the BFE, i.e.; the existing building does not have to be elevated. If the proposed lateral addition also includes rehabilitation or remodeling of the existing building, then the whole project as a combination of work must be considered. Vertical additions would require that the entire structure be elevated to or above the BFE. Even though the improvement itself is entirely above the BFE, it is dependent on the walls and foundation of the existing building for structural support.

    (b)

    Except for work specifically exempted under Chapter 6, the Building Official shall require building permits/floodplain development permits for all proposed construction or other improvements within areas of special flood hazard. In addition to the standard requirements for a building permit, an application for a building permit for construction or improvements within areas of special flood hazard shall contain the information and certifications set forth in a form provided by the Building Official.

    (c)

    All building foundations shall rest directly on natural rock, on concrete piling driven to rock or on friction piling (concrete or wood) and shall be anchored to such rock support by holes, 16 inches in minimum diameter, augured into such rock a minimum depth of three feet and reinforced by a minimum of four #5 vertical rods extending up into the piers above a minimum of 18 inches and tied to the vertical steel of the pier. Wooden pilings shall be locked into 16-inch auger foundations by at least a #5 rebar extending through the piling and three to five inches beyond.

    (d)

    The permit holder shall provide a floor elevation after the lowest floor is completed or, in instances where the structure is subject to the regulations applicable to coastal high-hazard areas, after placement of the lowest horizontal structural members of the lowest floor. Floodproofing certification for nonresidential structures in A-Zones shall be provided prior to a certificate of occupancy or prior to final inspection.

    (e)

    Within 21 calendar days of establishment of the lowest floor elevation, or upon placement of the lowest horizontal structural members of the lowest floor, whichever is applicable, it shall be the duty of the permit holder to submit to the Building Official a certification of the elevation of the lowest floor within A zones or the lowest portion of the lowest horizontal structural members of the lowest floor within V zones, whichever is applicable, as built in relation to mean sea level. Such certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by the same. When floodproofing is used for a building within A zones, the certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work done within the 21-day period and prior to submission of the certification shall be at the permit holder's risk. The Building Official shall review the floor elevation survey data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit the survey or failure to make the corrections required hereby shall be causes to issue a stop-work order for the project.

    (f)

    The degree of flood protection required in this chapter is reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare occasions. Flood heights may be increased by manmade or natural causes. This chapter does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This chapter shall not create liability on the part of the county or any officer or employee thereof for any flood damages that result from reliance on this chapter or any administrative decision lawfully made thereunder.

( Ord. No. 006-2016 , § 1(Exh. 1), 4-13-2016)